Penmann has completed a complex HVAC upgrade at Nutricia’s Liverpool-based production site, providing a bespoke ventilation and climate control system engineered to meet stringent hygiene and production standards. The project covered the design, supply, installation and commissioning of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) https://www.penmann.co.uk/penmann-completes-precision-hvac-upgrade-for-nutricias-fsi-phases-1-2-in-liverpool/