The main park features a capability of two hundred MW whilst Sandrini II has a capacity of a hundred MW. The full cost of each projects weren't disclosed nevertheless, in the course of building, above two hundred personnel ended up utilized. The jobs are envisioned to find out a handful https://californiasolarcompany.school.blog/