10 months in the past I've had no difficulties with this company. The panel and inverter installation method went really efficiently. No roof tiles were being damaged. The whole installation took about 3 hrs. To this point, I'm very pleased with the merchandise applied. four months in the past I'm https://citypointsolar.com.au/4-factors-to-consider-when-installing-solar/